Heavy Weight Drill Pipe Preventing Stress Concentration

Product Details
Customization: Available
After-sales Service: 7X24
Warranty: 13months
Still deciding? Get samples of US$ 1000/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company
Secured Trading Service
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
5000000 RMB
Plant Area
501~1000 square meters
  • Heavy Weight Drill Pipe Preventing Stress Concentration
  • Heavy Weight Drill Pipe Preventing Stress Concentration
  • Heavy Weight Drill Pipe Preventing Stress Concentration
  • Heavy Weight Drill Pipe Preventing Stress Concentration
  • Heavy Weight Drill Pipe Preventing Stress Concentration
  • Heavy Weight Drill Pipe Preventing Stress Concentration
Find Similar Products

Basic Info.

Model NO.
API 5DP
Manufacturing Process
Forging
Surface Treatment
Sand Blast
Operation Pressure
as Required
Material
Alloy
Standard
API Spec 5dp
Transport Package
Steel Strap Packaged
Specification
2-7/8"-5-1/2"
Trademark
LFM
Origin
China
Production Capacity
100000PCS/Year

Product Description

Product Description
HWDP
Heavy Weight Drill Pipe
LFM manufactures heavy weight drill pipe from 2 7/8" OD to 6 5/8" OD in Range 2 and Range 3 lengths. HWDP can be supplied either in Conventional Friction Welded or Integral design in accordance
LFM HEAVY WEIGHT DRILL PIPE
LFM manufactures heavy weight drill pipe from 2 7/8" OD to 6 5/8" OD in Range 2 and Range 3 lengths. HWDP can be supplied either in Conventional Friction Welded or Integral design in accordance with API Spec 7-1 and NS-1 specifications. HWDP can be supplied in Conventional Slick, Spiraled or Tri-Spiral forms. Apart from standard API and NS-1 grades, LFM can supply Sour Service HWDP in friction welded or integral form.
STANDARD HEAVY WEIGHT DRILL PIPE
LFM standard heavy weight drill pipe assembly is made up of pin and box tool joints and a heavy weight tube with center upset or wear pad.
This configuration helps to prevent stress concentration which could otherwise occur and allows directional drilling with controlled torque and reduce differential pressure sticking.
The service life of the HWDP is extended to maximize your investment by;
• Providing extra-long tool joint that increases tong space which allows more connection recuts.
• Reducing wear rate on tube OD through additional protection by the center upset or wear pad which keep the tube away from the hole.
 
HEAVY WEIGHT SPIRAL DRILL PIPE
LFM heavy weight spiral drill pipe handles maximum stresses induced at tough drilling environments in vertical and directional wells.
The heavy weight spiral drill pipe shares many of the same features from the standard heavy weight drill pipe except that the pipe body has an enlarged center section with three spiral grooves.
The spiral design adds following advantages;
• Better reduction in differential sticking.
• Increased weight and stiffness.
• Minimizes wear.
• Improves cutting circulation for better hole cleaning.
Specification 3-1/2"- 6-5/8"
Executive Standard API Spec 7-1
SIZE PIPE BODY TOOL JOINT Kg/Piece
OD (mm) ID (mm) UPSET SIZE CONNECTION OD (mm) ID (mm) Chamfering diameter
Central section Telos RSC type (mm)
(mm) (mm)
3-1/2" 88.9 57.4 101.6 98.4 NC38 127 52.4 116.3 312
3-1/2" 88.9 57.2 101.6 98.4 NC38 127 57.2 116.3 282
4" 101.6 65.1 114.3 106.4 NC40 133.4 65.1 127.4 370
4-1/2" 114.3 69.9 127 119.1 NC46 158.8 69.9 145.3 558
5" 127 76.2 139.7 130.2 NC50 168.3 76.2 154 672
5-1/2" 139.7 92.1 152.4 144.5 5 1/2FH 184.2 92.1 170.7 776
6-5/8" 168.3 114.3 184.2 176.2 6 5/8FH 203.2 144.3 195.7 964


Product Photos

Heavy Weight Drill Pipe Preventing Stress ConcentrationHeavy Weight Drill Pipe Preventing Stress ConcentrationHeavy Weight Drill Pipe Preventing Stress ConcentrationHeavy Weight Drill Pipe Preventing Stress Concentration

Factory
Heavy Weight Drill Pipe Preventing Stress Concentration

Certificates
Heavy Weight Drill Pipe Preventing Stress Concentration
FAQ


Q1: What's your packing?
A:  Regular packing.

Q2: What's your delivery?
A:  Normally, about 30-45 days.

Q3:  What are the shipping methods?
A: Ocean shipment to the port near from you; Air shipment to the shipment near from your company; Door to door service by  international express.

Q4:  What about the payment options?
 A: In general, we accept T/T. 

Q5:  When can I get the price?
A: We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price,please call us or tell us in  your  email so that we will detail with your inquiry priority.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now