• Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price
  • Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price
  • Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price
  • Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price
  • Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price
  • Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price

Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price

After-sales Service: 7X24
Warranty: 12months
Certification: ISO 9001:2000, ISO 9001:2008, API
Samples:
US$ 10/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price pictures & photos
Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price
US $100 / Piece
Min. Order: 1 Piece
Diamond Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
Basket
Surface Treatment
Spray-Paint
Centralizer Type
Cement Basket
Structure
Slider
Material
Carbon Steel
Type
Cement Basket
Processing Type
Forging
Transport Package
Wooden Box
Specification
4-1/2"-30"
Trademark
LFM
Origin
China
HS Code
8431431000
Production Capacity
100000PCS/Year

Product Description

Description:
Cement Basket is an effective aid in retaining and supporting the cement where weak formations and stage cementing is encountered.
It is designed with Flexible Bow Springs, heat-treated under controlled condition for maximum strength and uniformity are welded to slip on collar and overlapping metal fins for flexibility and strength to support long columns of cement during primary cementing operation.
The cement basket can restrict the downward migration of cementing fluids. They are usually installed above lost circulation zones, under stage tools, or near surface when a top cementing job is planned.
1. Non-welded, pressed by punching, high strength.
2. Compared with single bow centralizer, the restoring force is higher while the starting force and running force are lower. Therefore, it can be run in vertical, highly-deviated and horizontal wells.
3. Hinged design allows convenient field installation.
4. Can be unfolded and stacked flatly, saving storage and transportation cost.
 
Technical Data:
Casing size NO. of Bows Total Length Basket O.D. Min. Hole Size
In. in mm in
4 1/2 10 24 1/2 12 1/2 317.5 6
5 10 24 1/2 13 342.9 6
5 1/2 12 24 1/2 13 1/2 342.9 7 1/4
6 5/8 12 24 1/2 14 5/8 371.5 8 3/8
7 14 24 1/2 15 381.0 8 3/8
7 5/8 14 24 1/2 15 5/8 396.9 9 1/2
8 5/8 16 24 1/2 16 5/8 422.3 10 5/8
9 5/8 18 24 1/2 17 5/8 447.7 11 5/8
10 3/4 18 24 1/2 18 3/4 476.3 12 3/4
11 3/4 20 24 1/2 19 3/4 501.7 13 3/4
11 3/8 24 24 1/2 21 3/8 542.9 15 1/2
16 28 24 1/2 24 609.6 18
18 5/8 34 24 1/2 26 5/8 676.3 20 5/8
20 34 24 1/2 28 711.2 22

Pictures:
Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory PriceOilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory PriceOilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory PriceOilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price
Factory
Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory PriceOilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory PriceCertificates
Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price
FAQ


Q1: What's your packing?
A:  Regular packing.

Q2: What's your delivery?
A:  Normally, about 30-45 days.

Q3:  What are the shipping methods?
A: Ocean shipment to the port near from you; Air shipment to the shipment near from your company; Door to door service by  international express.

Q4:  What about the payment options?
 A: In general, we accept T/T. 

Q5:  When can I get the price?
A: We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price,please call us or tell us in  your  email so that we will detail with your inquiry priority.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price pictures & photos
Oilfield Slip on Metal Steel Fins Cement Basket, Canvas Cementing Basket with Factory Price
US $100 / Piece
Min. Order: 1 Piece
Diamond Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
Registered Capital
5000000 RMB
Plant Area
501~1000 square meters