• Rope Arranger for Oil Well Drill Rig 38mm Wire Rope
  • Rope Arranger for Oil Well Drill Rig 38mm Wire Rope
  • Rope Arranger for Oil Well Drill Rig 38mm Wire Rope
  • Rope Arranger for Oil Well Drill Rig 38mm Wire Rope
  • Rope Arranger for Oil Well Drill Rig 38mm Wire Rope
  • Rope Arranger for Oil Well Drill Rig 38mm Wire Rope

Rope Arranger for Oil Well Drill Rig 38mm Wire Rope

After-sales Service: 7X24
Warranty: 12month
Certification: ISO 9001:2000, ISO 9001:2008
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Rope Arranger for Oil Well Drill Rig 38mm Wire Rope pictures & photos
Rope Arranger for Oil Well Drill Rig 38mm Wire Rope
US $500-1,000 / PCs
Min. Order: 1 PCs
Diamond Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
rope arranger
Condition
New
Motor
DC Motor
Drill Hole Diameter
>300mm
Drill Hole Depth
>300m
Bit Type
Diamond Bit
Drilling Way
Compound
Usage
Drill Rig
Transport Package
Wooden Box
Specification
38mm 35mm 30mm 29mm
Trademark
LIGHTFIR
Origin
China
HS Code
8431431000
Production Capacity
1000PCS/Year

Product Description


Product Description

It is a kind of automatic and mandatory mechanical rope arrangement device. The output gear set is installed on the ends of the drum, chain wheel drive and bevel gear drive put in rotation the two reversing bevel gears that embed on the same transmission shaft which is connected with lead screw through safety clutch. Wheel set for rope arrangement is amounted on the lead screw, two reversing bevel gears are installed on the slide combination device of its transmission shaft, with the slide combination device controlling its moving towards left and right through shifter fork, and the action for the two cylinders is controlled by two mechanical control valves and a reversing valve. The new-style applicable device can achieve automatic rope arrangement, ease labor intensity, improve quality of rope arrangement and prolong the service life of steel rope.

Rope Arranger for Oil Well Drill Rig 38mm Wire RopeRope Arranger for Oil Well Drill Rig 38mm Wire RopeRope Arranger for Oil Well Drill Rig 38mm Wire Rope

Factory
Rope Arranger for Oil Well Drill Rig 38mm Wire Rope

Certificates
Rope Arranger for Oil Well Drill Rig 38mm Wire Rope
FAQ


Q1: What's your packing?
A:  Regular packing.

Q2: What's your delivery?
A:  Normally, about 30-45 days.

Q3:  What are the shipping methods?
A: Ocean shipment to the port near from you; Air shipment to the shipment near from your company; Door to door service by  international express.

Q4:  What about the payment options?
 A: In general, we accept T/T. 

Q5:  When can I get the price?
A: We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price,please call us or tell us in  your  email so that we will detail with your inquiry priority. 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Rope Arranger for Oil Well Drill Rig 38mm Wire Rope pictures & photos
Rope Arranger for Oil Well Drill Rig 38mm Wire Rope
US $500-1,000 / PCs
Min. Order: 1 PCs
Diamond Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
Registered Capital
5000000 RMB
Plant Area
501~1000 square meters